Scrap
Front and rear DS 2500s arrived. The both cost similar amounts, yet the fronts are twice the size of the rears lol
New lock ring to replace one i butchered in a fit of rage
Front and rear diff bearings and seals
Bushings pressed into the TCAs. Obviously these will be getting a good clean and paint before refitting. I've new balljoint rubbers to go on as well.
New rear brake lines
New fuel filter with new -6 fittings
New fittings for the fuel pump
8m of 600 series hose.
I'm waiting for 3 more fittings to complete the fuel system, I also need to figure out a neat way to secure the lines under the car whilst avoiding drilling new holes everywhere.
Cheers This teflon stuff (11.15mm OD) is smaller OD than the rubber - 6 though
I can never do anything the easy way lol
Rear brakes finally arrived back from Bigg Red
I'm impressed with the finish, however, I'm not too impressed with the time they took to refurbish the calipers.
about time,ill maybe get my ramp back